VALIANO SPECIFIC PLAN

PDS2013-SP-13-001, PDS2013-GPA-13-001, PDS2013-REZ-13-001, PDS2013-TM-5575,
PDS2014-MUP-14-019, PDS2013-STP-13-003, PDS2013-ER-13-08-002

Project Contact: Michelle Chan | Michelle.Chan@sdcounty.ca.gov | (858) 495-5428 
Environmental Coordinator: Donna Beddow | Donna.Beddow@sdcounty.ca.gov | (858) 694-3656 

...

RECIRCULATION DRAFT ENVIRONMENTAL IMPACT REPORT

...

PROJECT DOCUMENTS

ENVIRONMENTAL DOCUMENTS 

DRAFT ENVIRONMENTAL IMPACT REPORT

 

TOC, LIST OF ACRONYMS AND ABBREVIATIONS
SUMMARY
CHAPTER 1.0   PROJECT DESCRIPTION, LOCATION, AND ENVIRONMENTAL SETTING 
                        (Parts: 1, 2, 3, 45, 6, 7 )

CHAPTER 2.0   SIGNIFICANT ENVIRONMENTAL EFFECTS OF THE PROPOSED PROJECT

    2.1       Aesthetics (Parts: 1, 2, 3, 4, 5, 6, 7, 8, 9 )
    2.2       Air Quality
    2.3       Agricultural Resources (Parts: 1, 2 )
    2.4       Biological Resources (Parts: 1, 2, 3, 4 )
    2.5       Cultural Resources
    2.6       Noise
    2.7       Paleontological Resources
    2.8       Transportation/Traffic
    2.9       Hazards and Hazardous Materials
    2.10     Geology and Soils
    2.11     Utilities
    2.12     Significant Irreversible Environmental Changes Which Would be Involved in the Proposed
                Project Should it be Implemented

CHAPTER 3.0   ENVIRONMENTAL EFFECTS FOUND NOT TO BE SIGNIFICANT

    3.1      Effects Found Not Significant as Part of the EIR Process
        3.1.1    Global Greenhouse Gases
        3.1.2    Energy
        3.1.3    Hydrology and Water Quality
        3.1.4    Land Use and Planning
        3.1.5    Population and Housing
        3.1.6    Recreation
        3.1.7    Public Services

    3.2      Effects Found Not Significant During Initial Study
        3.2.1    Mineral Resources

CHAPTER 4.0   PROJECT ALTERNATIVES (Parts: 1, 2, 3, 4

CHAPTER 5.0   LIST OF REFERENCES

CHAPTER 6.0   LIST OF EIR PREPARERS AND PERSONS AND ORGANIZATIONS CONTACTED

CHAPTER 7.0   LIST OF MITIGATION MEASURES AND PROJECT DESIGN FEATURES

 

TECHNICAL APPENDICES
(Bound in Separate Volumes Except Appendices A and O)

  A Notice of Preparation  (NOP) and Comments on the NOP (see below)
  B Visual Impact Analysis (Parts: 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 )
  C Air Quality Analysis Report (Parts: 123456 )
  D Agricultural Resources Report (Parts:  1234567 )
  E Biological Technical Report (Pages: 1-8,   9-20,   21-26,   27-30,   31-36,   37-70 )
         Addendum 1 - Reservoir
         Appendices  A - G,  H  
  F Cultural Resources Inventory (Parts: 12  3456789 )
         Addendum 1 - Reservoir
         Addendum 2 - Offsite Roads
  G Acoustical Site Assessment Report (Parts: 1, 2, 3, 4 )
  H Traffic Impact Analysis
  I Phase I and II Environmental Site Assessment (ESA) Central portion (Parts: 123456 )
         Phase I ESA - Neighborhood 5 (Parts: 123 )
         Phase I ESA - Addendum Northern Parcel
  J Greenhouse Gases Analyses Report (Parts: 123 )
  K Geotechnical Investigations: Central Portion (Parts: 12AppendicesNeighborhood 5Appendices )
  L Fire Protection Plan (Parts: 1, 2, 3, Fuel Treatment Location Map )
  M CEQA Drainage Study (Parts: 1, 2, 3, 4, 5, 6, 7, 8, 9 )
         Hydromodification Management Study (Parts: 1, 2, 3, 4 )
  N Major Stormwater Management Plan
  O Project Facility Availability Forms
         Updated Rincon Del Diablo Municipal Water District Form 
     Updated San Diego County Sanitation District Sewer Form
  P Conceptual Water and Recycled Water Study
  Q Conceptual Sewer Study
...

NOTICE OF PREPARATION

A Notice of Preparation (NOP) of an Environmental Impact Report (EIR) was distributed from June 20, 2013 to July 19, 2013.  Click on the links below for all comments received by the Department.

Notice of Preparation
NOP Comments (Individuals)
NOP Comments (Agencies and Groups)
Initial Study