Lilac Hills Ranch Draft FEIR

Project Contact: Mark Slovick -  Mark.Slovick@sdcounty.ca.gov , (858) 495-5172

To sign up for updates on this project, please click here:   E-mail Updates 

The Lilac Hills Ranch Project will not be heard by the Board of Supervisors on October 14, 2015. Updates regarding the Board of Supervisor’s hearing dates will be posted on this website and on the Clerk of the Board of Supervisors’ website in advance of the future hearing, which can be viewed at http://www.sandiegocounty.gov/content/sdc/cob/bosa.html.

 

Planning Commission Site Tour (08/12/2015) Video:

Staff Report

    Attachment A
    Attachment B
    Attachment C (Part: 1 2 3)
    Attachment D
    Attachment E 
    Attachment F 
    Attachment G 
    Attachment H (Part: 1 2 3 4 5 6 7)
    Attachment I 
    Attachment J 
    Attachment K
    Attachment L
    Attachment M 
    Attachment N 
    Attachment O 
    Attachment P

Draft Final Environmental Impact Report             

    Title Page & Table of Contents & List of Acronyms

    Executive Summary

     Statement of Location and Custodian of Documents

    Chaper 1 - Project Description, Location, and Environmental Setting (Part 1 2)

    Chaper 2 - Significant Environmental Effects of the Proposed Project 
                    Visual Resources (Part 1 2
                    Air Quality 
                    Transportation/Traffic 
                    Agricultural Resources (Part 1 2
                    Biological Resources (Part 1 2
                    Cultural Resources 
                    Hazards and Hazardous Materials 
                    Noise 
                    Significant Irreversible Environmental Changes

    Chapter 3 - Environmental Effects Found Not to be Significant 
                     Geology and Soils 
                    Greenhouse Gas Emissions 
                    Hydrology and Water Quality 
                    Land Use 
                    Public Services
                    Recreation 
                    Utilities and Service Systems 
                    Energy Use and Conservation 
                    Effects Found Not Significant During Initial Study

    Chapter 4 - Project Alternatives (Part 1 2 3)

    Chapter 5 - List of References

    Chapter 6 - List of EIR Preparers and Persons and Organizations Contacted

 

    Technical Appendices

        Appendix A - Notice of Preparation (NOP) and Initial Study 
        Appendix B - NOP Comments 
        Appendix C - Visual Resources Report (Part 1 2 3
        Appendix C-1 - Sight Distance Analyses 
        Appendix C-2 - Photometric Study (Part 1 2
        Appendix D - Air Quality Report 
        Appendix E - Traffic Impact Study (Part 1 2 3 4 5 6 7 8 9 10 11)
                 Traffic Impact Appendices (Part 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16)
        Appendix F - Agricultural Resources Report (Part 1 2 3 4
        Appendix G - Biological Technical Report (Part 1 2 3 4 5 6
        Appendix H- Cultural Resources  Report & Addendum (Part 1 2 3 4 5 6 7 8 9)
                 Miller Fire Station Addendum
                 Gopher Canyon Road Addendum    
        Appendix I - Hazards and Hazardous Materials
                I - Hazards On-Site (Part 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23)
                I - Hazards Off-Site (Part 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18)
                I-1 Reconnaissance of Off-Site Improvement Areas (Part 1 2 3 4 5 6 7 8 9 10 11 12)
        Appendix J - Fire Protection Plan 
                County of San Diego and CALFIRE Fire Protection Agreement dated April 15, 2011 
                County of San Diego and CALFIRE Fire Protection Agreement dated October 11, 2013 
        Appendix K - Evacuation Plan 
        Appendix L - Vector Management Plan 
        Appendix M - Noise Analysis  
        Appendix N - Geotechnical Study (Part 1 2 3 4 5
                 Supplemental Geotechnical Study
        Appendix O - Greenhouse Gas Analysis  
         Appendix P - Hydrogeologic Assessment  
         Appendix Q - Water Supply Assessment  
         Appendix R - Project Facility Availability Forms  
         Appendix S - Wastewater Management Alternatives  
         Appendix T - Water Service Report  
                Emergency Water Conservation Consistency Analysis 
        Appendix U-1 - Stormwater Management Plan 
                Master Tentative Map (Part 1 2 3)     Implementing Tentative Map 
        Appendix U-2 - Drainage Study 
                Master Tentative Map (Part 1 2 3 4)   Implementing Tentative Map 
        Appendix U3 - Hydromodification Management Plan (Part 1 2 3 4)  
        Appendix V - Mountain Ridge Road Fire Station Alternative 
                 Air Quality Analysis  
                Traffic Impact Study (Part 1 2 3 4 5 6 7 8 9 10 11 12)
                Traffic Impact Study  Appendices (Part 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
                Noise Analysis  
                Greenhouse Gas Analysis  
                Visual Analysis  
         Appendix W - General Plan Consistency Analysis Matrix

 

Specific Plan - SP 12-001 (Part 1 2 3 4 5
        Specific Plan Strike Out Underline (Part 1 2 3 4)

        Appendices
                1,000 - Scale Site Plan 
                Fire Station Public Road Alternative 
                Project Facility Availability Forms:                     
                    Schools (Valley Center Pauma Unified School District  Bonsall Union School District School)
                    Water 
                    Sewer 
                    Fire 
                    Police 
                Capabilities Assessment (Part 1 2 3)
                NGBS Certification 
                NGBS Application (Part 1 2 3 4 5 6 7 8 9)

    Habitat Loss Permit

    Habitat Loss Permit Exhibits

    Implementing Conceptual Landscape Plan - TM 5572 (Part 1 2 3)

    Implementing Preliminary Grading Plan - TM 5572 (Part 1 2 3 4)

    Implementing Tentative Map - TM 5572 (Part 1 2)

    Major Use Permit - Wastewater Treatment Plant - MUP 12-005

    Master Preliminary Grading Plan - TM 5571 (part 1 2 3)

    Master Tentative Map - TM 5571 (Part 1 2)

    Site Plan - D Designator and V Setbacks - STP 12-017 (Withdrawn)

    Site Plan - Private Parks - STP 12-018

    Parking Analysis  

    Project Issue Checklist 

    Roundabout Exhibit - Sight Distance (Exhibit 1) (Exhibit 2

    Roundabout Exhibit - Turning Movements  

    Roundabout Peer Review Exhibit of Findings

    Modifications to Road Standards     
            West Lilac Road - I-15 Bridge to Old Highway 395
            I-15 Bridge  
            West Lilac Road - Project Boundary to Westerly Roundabout  
            West Lilac Road - Westerly Roundabout to Northerly Project Boundary  
            West Lilac Road - Along Northerly Project Boundary 
            West Lilac Road - Easterly Roundabout  
            Mountain Ridge Road - Reduced Design Speed  
            Mountain Ridge Road - Taper at Intersection with Circle 'R' Drive  
            Street 'C' - Reduced Design Speed  
            Street 'E' - Reduced Design Speed

    Slope Analysis

    Steep Slope Encroachment Map

    Reference Documents: 

            Lower Moosa Canyon Water Reclamation Facility Expansion EIR  
            San Diego County Water Authority Urban Water Management Plan