Riverford Road Roundabouts Project

Proposed Project Overview
The Riverford Road Roundabouts Project proposes to construct two new roundabouts in the Lakeside community of San Diego County. The northern roundabout will replace the intersection of Riverford Road and the SR-67 southbound on and off-ramps, and will include North Woodside Avenue traffic. The southern roundabout will replace the existing signal-controlled intersection of Riverford Road and Woodside Avenue, as well as the signal-controlled intersection of Woodside Avenue and the SR-67 northbound off-ramp.
Among the many benefits of the project, key benefits include:
- Improving overall traffic efficiency, circulation, and reducing congestion at these busy intersections
- Significant reduction in the severity of accidents compared to stop-controlled and signalized intersections. This means less fatal, serious, and injury-related crashes.
- Creating a "complete street" with new crosswalks, shared-use pathways for pedestrians and cyclists, and improved lighting
- Offsetting increased traffic from future development projects
This project is being designed by the County with oversight from Caltrans Department of Transportation. The County will continue to engage the community and seek input and participation as we move through the design process. Currently, construction is anticipated for Summer 2028.
MORE INFORMATION:
Current Status
After receiving public input during prior outreach events, revisions to the project were made including:
Northern Intersection
- Adding sidewalk connecting to existing sidewalk on Riverford Road bridge spanning San Diego River.
- Adding sidewalk between northern roundabout and N. Woodside Ave.
- Installing crosswalk between northern roundabout and N. Woodside Ave.
- Installing two Rapid Flash Beacons on both sides of crosswalk at southbound SR-67 off-ramp.
- Installing pedestrian push buttons to activate Rapid Flash Beacons.
- Removing current left-turn pocket and paved corner of N. Woodside Ave. The abandoned portion of N. Woodside Ave will become part of the vegetated northern bioretention area.
Southern Intersection
- Installing two Rapid Flash Beacons on both sides of a crosswalk at northbound SR-67 off-ramp.
- Installing pedestrian push buttons to activate Rapid Flash Beacons.
Conceptual Project Exhibit
Conceptual Project Renderings
Existing Photo of Southern Roundabout
Rendering of Southern Roundabout Looking West
Existing Photo of Northern Roundabout
Rendering of Northern Roundabout Looking South
Southern Roundabout - Existing to Proposed
Northern Roundabout - Existing to Proposed
Utility Relocations
Overhead and underground utility relocations are anticipated to be required to complete the project improvements. The utilities affected are SDG&E (gas and electric facilities), AT&T, COX, Lumen/Level 3, Helix Water District, and Padre Dam Municipal Water District.
Environmental Review
In accordance with State CEQA Guidelines, a Draft Mitigated Negative Declaration was prepared and published for a public review comment period from October 25 - November 29, 2024. The MND public review period is now closed.
Previous Events
- 7/24/24 – Riverford Road Roundabouts Open House
- Lakeside Library, 12428 Woodside Avenue, Lakeside, CA 92040
- 6/5/24 – Lakeside Community Planning Group Meeting
Next Steps
- 10/1/26 - Riverford Road Roundabouts Open House
- Doors will open at 5:00 PM, followed by a presentation beginning at 6:00 PM. The open house is scheduled to conclude at 8:00 PM.
- Lakeside Library, 12428 Woodside Avenue, Lakeside, CA 92040
- Come see the updated design, talk with the project team, ask questions, and share your feedback.
Project Team
- Project Manager: Ryan Lau, P.E.
- Design Manager: Ben Mehtlan, P.E.
- Environmental Manager: Jeff Kashak