Green Street Clean Water Plan

Wintercrest Drive Green Street Project

Water Quality Project | Construction Estimated to Begin Spring 2028

Line

The project proposes to design and construct subsurface biofiltration basins along Wintercrest Drive and Winter Gardens Boulevard in the community of Lakeside.

Subsurface biofiltration basins are green stormwater infrastructure devices designed to capture, temporarily store, and treat stormwater runoff beneath the ground surface. These basins utilize specialized engineered layers to clean water while remaining completely hidden under roadways.

Wintercrest Dr
Conceptual rendering of subsurface biofiltration basin on Wintercrest Drive. Final design is subject to change based on construction limitations.
Wintercrest Bvd
Conceptual rendering of subsurface biofiltration basin on Winter Gardens Boulevard. Final design is subject to change based on construction limitations.
Line

Construction: What to Expect

Construction is expected to begin in Spring 2028 and anticipated to be completed in late 2028.

Please note that construction dates are subject to change due to compliance requirements, inclement weather, and/or other unforeseen circumstances. 

During construction, the County will make every effort to minimize disruptions in the surrounding area. While most work will occur within the public road right-of-way, temporary access to private property will be needed in some cases. There will be temporary impacts to utilities, and to both vehicular and pedestrian traffic. Traffic control measures, including signage placed prior to and during construction, will be implemented to ensure the safety of our customers.

The County of San Diego Project Manager for this project is René Vidales. Contact information for Mr. Vidales is provided below:

Title1

This project was identified in the Green Streets Clean Water Plan. 

Learn More:

View our full list of Green Infrastructure Projects

What is Green Infrastructure?

Return to the Watershed Protection Homepage

Sign up for the Quarterly Green Infrastructure Newsletter

Grey-Line
County-Department-Group-DPW-RightRail

The County of San Diego is proud to implement projects like this to improve water quality, support sustainability, and enhance our local communities.

Grey-Line