| Permit Type | Current Code Section | Current Fee |
| Recycled Water Plan Check Fees: Hourly rate as authorized in
subsection (m). | 65.107(g)(1) | Varies, see
hourly rates in miscellaneous department fees |
| Recycled Water Inspection: Hourly rate as authorized in
subsection (m). | 65.107(g)(2) | Varies, see
hourly rates in miscellaneous department fees |
| Percolation Test/Soil Profile Review |
65.107(g)(3) | $ 952 |
| Layout Report: New Construction | 65.107(g)(3) |
$ 1,789 |
| Layout Report: Additions/Pools | 65.107(g)(3) |
$ 1,606 |
| Layout Report: Revision | 65.107(g)(3) | $
1,102 |
| Layout Diagram/Information Review over the counter, no field
investigation | 65.107(g)(3) | $ 311 |
| Septic Tank / Seepage Pit Destruction Stand Alone Project:
Hourly rate as authorized in subsection (m). |
65.107(g)(4) | Varies, see hourly rates in
miscellaneous department fees |
| Septic Tank / Seepage Pit Destruction with Repair Project:
Hourly rate as authorized in subsection (m). |
65.107(g)(4) | Varies, see hourly rates in
miscellaneous department fees |
| Holding Tank / Vaulted-Privy / Other Sanitation Facilities
Project Review: Hourly rate as authorized in subsection
(m). | 65.107(g)(4) | Varies, see hourly rates in
miscellaneous department fees |
| Holding Tank / Vaulted-Privy / Other Sanitation Facilities
Installation Permit: Hourly rate as authorized in subsection
(m). | 65.107(g)(4) | Varies, see hourly rates in
miscellaneous department fees |
| Standard Onsite Wastewater System Installation Permit |
65.107(g)(4) | $ 994 |
| Standard Onsite Wastewater System Re-Inspection |
65.107(g)(4) | $ 380 |
| Standard Onsite Wastewater System Repair Installation
Permit | 65.107(g)(4) | $ 969 |
| Treated Onsite Wastewater System Installation Permit |
65.107(g)(4) | $ 1,753 |
| Treated Onsite Wastewater System Major Repair Installation
Permit | 65.107(g)(4) | $ 1,669 |
| Treated Onsite Wastewater System Annual Operating Permit |
65.107(g)(4) | $ 624 |
| Onsite Wastewater System Enforcement: Assessed at the approved
hourly rate as authorized in subsection (m), minimum two
hours | 65.107(g)(4) | Varies, see hourly rates
in miscellaneous department fees |
| Qualified Professional, Licensed Installer, Qualified Service
Provider, Owner-Builder Demonstration (Consultation Review)
Assessed at the approved hourly rate as authorized in subsection
(m), minimum two hours | 65.107(g)(4) | Varies,
see hourly rates in miscellaneous department fees |
| Qualified Professional, Licensed Installer, Qualified Service
Provider, Owner-Builder Annual Registration |
65.107(g)(4) | $ 80 |
| Lot Line Adjustment/Certificate of Compliance/Conditional
Certificate of Compliance, up to four lots, field investigation
needed | 65.107(g)(5) | $ 1,949 |
| Lot Line Adjustment/Certificate of Compliance/Conditional
Certificate of Compliance over the counter, no field
investigation | 65.107(g)(6) | $ 440 |
| Graywater System Permits: Plan Review - with field check |
65.107(g)(7) | $ 924 |
| Graywater System Permits: Installation Inspections |
65.107(g)(7) | $ 820 |
| Graywater System Permits: Re-Inspection Fee |
65.107(g)(7) | $ 350 |
| Complaint response. Department costs to investigate a
complaint and to verify return to compliance not otherwise
recovered through a reinspection fee, only if the complaint is
substantially validated: Assessed at the approved hourly rate as
authorized in subsection (m). | 65.107(g)(8) |
Varies, see hourly rates in miscellaneous department
fees |
| Sewage Pumper Examination Fee | 65.107(g)(9) | $
210 |
| Sewage Pumper Base Registration Fee |
65.107(g)(10) | $ 321 |
| Sewage Pumping Vehicle Permit (per vehicle) |
65.107(g)(11) | $ 203 |
| Sewage Pumping Vehicle complaint response. Department costs to
investigate a complaint of non- compliance by a sewage pumping
vehicle, and Department costs to verify return to compliance not
otherwise recovered through a reinspection fee, only if the
complaint is substantially validated: Assessed at the approved
hourly rate as authorized in subsection (m). |
65.107(g)(12) | Varies, see hourly rates in
miscellaneous department fees |
| Grading Plan, Major | 65.107(g)(13) | $ 872 |
| Deposit for a Special Projects Application Review (Initial
deposit, additional funds at the hourly rate may be required for
full cost recovery) | 65.107(g)(14) | $ 1,616 |
| Deposit for a Tentative Map (Initial deposit, additional funds
at the hourly rate may be required for full cost recovery) |
65.107(g)(15) | $ 3,719 |
| Deposit for Tentative Parcel Map on Septic or Sewer (Initial
deposit, additional funds at the hourly rate may be required for
full cost recovery) | 65.107(g)(16) | $ 2,021 |
| Deposit for Major Use Permits, Standard Application Review
(Initial deposit, additional funds may be required at the hourly
rate for full cost recovery) | 65.107(g)(17) | $
2,011 |
| Major Use Permit Modification/Minor Deviation |
65.107(g)(18) | $ 1,206 |
| Discretionary Project Review | 65.107(g)(19) | $
1,215 |
| Administrative Permit Standard Application |
65.107(g)(20) | $ 1,308 |
| Major Project Pre-application Conference |
65.107(g)(21) | $ 1,557 |
| Pre-application Conference (Initial Consultation - No
Permit) | 65.107(g)(22) | $ 479 |
| Site Plan Application | 65.107(g)(23) | $
1,088 |