| Permit Type | Current Code Section | FY 2026-27 Code Section | Current
Fee | FY 2026-27 Approved Fee |
| Pool Plan Review: One (1) body of water |
65.107(e)(1)(a) | 65.107(e)(1)(a) | $
2,092 | $ 2,129 |
| Pool Plan Review: Each body of water in excess of one (1) |
65.107(e)(1)(b) | 65.107(e)(1)(b) | $ 941 |
$ 981 |
| Pool Plan Review: Supplemental Fee for special purpose pools
and perimeter overflow system pools (includes activities pools,
spray grounds, pools > 3,000 square feet, and interactive
water features) | 65.107(e)(1)(c) |
65.107(e)(1)(c) | $ 1,692 | $ 1,727 |
| Pool Plan Review: Minor Remodel of one (1) Body of water |
65.107(e)(1)(d) | 65.107(e)(1)(d) | $ 490 |
$ 501 |
| Pool Plan Review: Additional fee for a Minor Remodel if each
body of water over one (1), (If with concurrent inspections for
all bodies of water) | 65.107(e)(1)(e) |
65.107(e)(1)(g) | $ 212 | $ 224 |
| Pool Plan Review: Renovation for each one (1) body of
water | 65.107(e)(1)(f) | 65.107(e)(1)(e) | $
802 | $ 820 |
| Pool Plan Review: Major Remodel for each one (1) body of
water | 65.107(e)(1)(g) | 65.107(e)(1)(f) |
$ 1,457 | $ 1,482 |
| Pool Facility Major Remodel Plan Revision, and Body of Water
as Built Plan | 65.107(e)(1)(h) |
65.107(e)(1)(h) | $ 495 | $ 511 |
| Restamping, Body of Water Minor Remodel Plan Revision, Body of
Water Renovation Plan Revision, or Approval of Non-Health
Regulated Building Plans as required by other governmental
agencies | 65.107(e)(1)(i) | 65.107(e)(1)(i) |
$ 232 | $ 245 |
| Pool Facility Single Equipment Change Out Plan Review |
| 65.107(e)(1)(j) | | $ 214 |
| Pool Plan Review: Additional fee for each construction
inspection of a body of water that is not conducted concurrently
with another Body of Water on the same project: Assessed at the
approved hourly rate as authorized in subsection (m). |
65.107(e)(1)(j) | 65.107(e)(1)(k) | Varies,
see hourly rates in miscellaneous department fees |
Varies, see hourly rates in miscellaneous department
fees |
| Pool Plan Review: Plan check review and related consultations,
when construction was initiated prior to the approval of plans
by both the Department and the local agency with authority over
building plans: Assessed at the approved hourly rate as
authorized in subsection (m). | 65.107(e)(1)(k) |
65.107(e)(1)(l) | Varies, see hourly rates in
miscellaneous department fees | Varies, see
hourly rates in miscellaneous department fees |
| Food Facility Plan Review: 0 - 1,999 Square Feet (up to three
preparation areas) | 65.107(e)(2)(a) |
65.107(e)(2)(a) | $ 1,534 | $ 1,534 |
| Food Facility Plan Review: 2,000 - 5,999 Square Feet (up to
three preparation areas) | 65.107(e)(2)(b) |
65.107(e)(2)(b) | $ 1,931 | $ 1,931 |
| Food Facility Plan Review: 6,000 - 9,999 Square Feet (up to
three preparation areas) | 65.107(e)(2)(c) |
65.107(e)(2)(c) | $ 3,153 | $ 3,153 |
| Food Facility Plan Review: 10,000 Square Feet and over (one
preparation area) | 65.107(e)(2)(d) |
65.107(e)(2)(d) | $ 3,407 | $ 3,407 |
| Food Facility Plan Review: Each additional food preparation
area after three sites for 0 - 9,999 square feet, and after one
for 10,000 square feet or greater | 65.107(e)(2)(e) |
65.107(e)(2)(e) | $ 679 | $ 679 |
| Prepackaged Food or Wholesale Food Warehouse Plan Review: 0 –
7,999 square feet | 65.107(e)(3)(a) |
65.107(e)(3)(a) | $ 810 | $ 810 |
| Prepackaged Food or Wholesale Food Warehouse Plan Review:
8,000 square feet and over | 65.107(e)(3)(b) |
65.107(e)(3)(b) | $ 1,003 | $ 1,003 |
| Multiple Kitchen Complex Plan Review |
65.107(e)(4) | 65.107(e)(4) | $ 1,446 | $
1,446 |
| Full Service/Direct Sales Catering Plan Review |
65.107(e)(5) | 65.107(e)(5) | $ 526 | $
526 |
| Food Facility Minor Remodel Plan Review |
65.107(e)(6) | 65.107(e)(6) | $ 670 | $
670 |
| Prepackaged CMFO/Prepackaged Truck Mobile Food Facility Plan
Review | 65.107(e)(7) | 65.107(e)(7) | $
293 | $ 293 |
| Unpackaged CMFO Plan Review | 65.107(e)(8) |
65.107(e)(8) | $ 518 | $ 518 |
| Open Food Preparation Truck Mobile Food Facility Plan
Review | 65.107(e)(9) | 65.107(e)(9) | $
545 | $ 545 |
| Mobile Food Support Unit Plan Review |
65.107(e)(10) | 65.107(e)(10) | $ 578 | $
578 |
| Prepackaged CMFO/Prepackaged Truck Mobile Food Facility
Template Plan Review | 65.107(e)(11) |
65.107(e)(11) | $ 256 | $ 256 |
| Unpackaged CMFO Template Plan Review |
65.107(e)(12) | 65.107(e)(12) | $ 302 | $
302 |
| Food Facility Plan Revision | 65.107(e)(13) |
65.107(e)(13) | $ 408 | $ 408 |
| Food Facility Plan Resubmittal | |
65.107(e)(14) | | $ 1,087 |
| Miscellaneous Facilities Plan Review: Body Art Facility Plan
Review (Body Art Facility) | 65.107(e)(14)(a) |
65.107(e)(15)(a) | $ 648 | $ 648 |
| Miscellaneous Facilities Plan Review: Massage Establishment
Plan Review (Massage Establishment) |
65.107(e)(14)(b) | 65.107(e)(15)(b) | $ 628 |
$ 628 |
| Miscellaneous Facilities Plan Review: Bathhouses or other
miscellaneous establishments where a plan review is
required | 65.107(e)(14)(c) | 65.107(e)(15)(c) |
$ 472 | $ 472 |
| Miscellaneous Facility Plan Revision/Resubmittal |
| 65.107(e)(15)(d) | | $ 268 |
| Expedited Plan Check Inspection: Assessed at one and a half
times the approved hourly rate as authorized in subsection (m),
minimum two hours. | 65.107(e)(16) |
65.107(e)(16) | Varies, see hourly rates in
miscellaneous department fees | Varies, see
hourly rates in miscellaneous department fees |
| Food Plan Check Office Consultation |
65.107(e)(17) | 65.107(e)(17) | $ 186 |
$ 186 |
| Food Plan Check Field Consultation | 65.107(e)(18) |
65.107(e)(18) | $ 401 | $ 401 |
| Pool Plan Check Office Consultation |
65.107(e)(19) | 65.107(e)(19) | $ 229 |
$ 236 |
| Pool Plan Check Field2x Plan Check Fee2x Plan Check Fee
Consultation | 65.107(e)(20) | 65.107(e)(20) |
$ 440 | $ 459 |
| Body Art Plan Check Office Consultation |
65.107(e)(21) | 65.107(e)(21) | $ 206 |
$ 206 |
| Body Art Plan Check Field Consultation |
65.107(e)(22) | 65.107(e)(22) | $ 413 |
$ 413 |
| Massage Plan Check Office Consultation |
65.107(e)(23) | 65.107(e)(23) | $ 209 |
$ 209 |
| Massage Plan Check Field Consultation |
65.107(e)(24) | 65.107(e)(24) | $ 417 |
$ 417 |
| Investigation of work without a permit. Whenever a food
facility is built, modified or remodeled without first
submitting an application for the required permit/plan review, a
special investigation shall be made before a permit may be
issued for such work. The fee for this investigation will be in
addition to the permit fee. | 65.107(e)(25) |
65.107(e)(25) | $ 346/$ 385 | Varies, see hourly
rates in miscellaneous department fees |
| Expedited Plan Review: Two times the plan check fee |
65.107(e)(15) | 65.107(e)(26) | 2x Plan Check
Fee | 2x Plan Check Fee |