Monitoring Wells Fees

Permit Type Current Code Section FY 2025-26 Code Section Current Fees FY 2025-26 Proposed Fees
Well Permit Application: Domestic Well 65.107(h)(1)(a) 65.107(h)(1)(a) $ 1,334 $ 1,572
Well Permit Application: Public Water Supply Well 65.107(h)(1)(b) 65.107(h)(1)(b) $ 2,397 $ 2,810
Well Permit Application: Well Destruction 65.107(h)(1)(c) 65.107(h)(1)(c) $ 1,228 $ 1,442
Monitoring Wells/Soil Boring: Initial 65.107(h)(1) (d)(i) 65.107(h)(1) (d)(i) $ 421 $ 478
Monitoring Wells/Soil Boring: Each Additional Soil Boring at a single site 65.107(h)(1)(d) (i) 65.107(h)(1)(d) (i) $ 129 $ 142
Monitoring Wells (Ground Water/Vadose Wells/Cathodic Protection Wells): Initial Monitoring Well 65.107(h)(1)(d) (ii) 65.107(h)(1)(d) (ii) $ 768 $ 873
Monitoring Wells (Ground Water/Vadose Wells/Cathodic Protection Wells): Each Additional Monitoring Well at a single site 65.107(h)(1)(d)(ii) 65.107(h)(1)(d)(ii) $ 490 $ 551
Monitoring Well Destruction: Initial Monitoring Well Destruction 65.107(h)(1)(d)(iii) 65.107(h)(1)(d)(iii) $ 377 $ 425
Monitoring Well Destruction: Each Additional Monitoring Well Destruction at a single site 65.107(h)(1)(d)(iii) 65.107(h)(1)(d)(iii) $ 234 $ 266
Soil Vapor Survey (per site) 65.107(h)(1)(e) 65.107(h)(1)(e) $ 1,411 $ 1,620
Extension of Permit 65.107(h)(2) 65.107(h)(2) $ 108 $ 112
Inactive Well Declaration 65.107(h)(3) 65.107(h)(3) $ 806 $ 898
Plan Check Re-submittal Fee. Assessed at the approved hourly rate as authorized in subsection (m). 65.107(h)(4) 65.107(h)(4) Varies, see hourly rates in miscellaneous department fees Varies, see hourly rates in miscellaneous department fees
Water Well Inspection Fee: For plan check inspections and final well permit re-inspections. Assessed at the approved hourly rate as authorized in subsection (m). 65.107(h)(5) 65.107(h)(5) Varies, see hourly rates in miscellaneous department fees Varies, see hourly rates in miscellaneous department fees
Monitoring Well Re-inspection Fee (per site) 65.107(h)(6) 65.107(h)(6) $ 668 $ 710
Review of variance from State Well Standards. Assessed at the approved hourly rate as authorized in subsection (m). 65.107(h)(7) 65.107(h)(7) Varies, see hourly rates in miscellaneous department fees Varies, see hourly rates in miscellaneous department fees
Discretionary/CEQA Review. Minimum charge, 2 hours at the approved hourly rate as authorized in subsection (m). 65.107(h)(8) 65.107(h)(8) Varies, see hourly rates in miscellaneous department fees Varies, see hourly rates in miscellaneous department fees
Collected Water Sample from Private Well 65.107(h)(9) 65.107(h)(9) $ 786 $ 838
Investigative Fee. For work done without a permit for which a permit is required or work done that is not in compliance with an approved permit: 100% of the permit cost. 65.107(h)(10) 65.107(h)(10) 100% of permit cost 100% of permit cost
Miscellaneous Well Program Fee. Includes Monitoring Well Program activities where no fee is specifically indicated. Assessed at the approved hourly rate as authorized in subsection (m). 65.107(h)(11) 65.107(h)(11) Varies, see hourly rates in miscellaneous department fees Varies, see hourly rates in miscellaneous department fees
Complaint Response. Department costs to investigate a complaint and to verify return to compliance not otherwise recovered through a reinspection fee, only if the complaint is substantially validated. Assessed at the approved hourly rate as authorized in subsection (m). 65.107(h)(12) 65.107(h)(12) Varies, see hourly rates in miscellaneous department fees Varies, see hourly rates in miscellaneous department fees
Enforcement Fee for noncompliance with permitting requirements and conditions as provided for in Section 67.440. Assessed at the approved hourly rate as authorized in subsection (m). 65.107(h)(13) 65.107(h)(13) Varies, see hourly rates in miscellaneous department fees Varies, see hourly rates in miscellaneous department fees